logo
İyi fiyat  çevrimiçi

Ürün ayrıntıları

Created with Pixso. Ana Sayfa Created with Pixso. Ürünler Created with Pixso.
HYPET Ekstrüzyon Makinesi
Created with Pixso. Plastic Pipe Extrusion Line / Pvc Pipe Extrusion Line

Plastic Pipe Extrusion Line / Pvc Pipe Extrusion Line

Marka Adı: SHENZHEN HYPET
Model Numarası: HYPVC-63 Plastik Boru Ekstrüzyon Hattı / Pvc Boru Ekstrüzyon Hattı
Adedi: Plastik Boru Ekstrüzyon Hattı / Pvc Boru Ekstrüzyon Hattı 1 set
fiyat: USD40000/set - USD55000/set
Teslimat süresi: Plastik Boru Ekstrüzyon Hattı / Pvc Boru Ekstrüzyon Hattı40-60 iş günü
Ödeme Koşulları: L/C, T/T
Detay Bilgisi
Menşe yeri:
Çin
Sertifika:
CE, ISO9001
Anahtar kelime:
Plastik Boru Ekstrüzyon Hattı / Pvc Boru Ekstrüzyon Hattı
Gerilim:
380V 50HZ 3Faz(Özelleştirilmiş)
Otomatik derecelendirme:
Otomatik
Kontrol:
PLC'ler
Uygulama:
Boru
invertör:
Abb
Kontaktör:
Siemens, Schnerder
Garanti:
18 ay
Ambalaj bilgileri:
Plastik Boru Ekstrüzyon Hattı / Pvc Boru Ekstrüzyon Hattı Standart İhracat Paketleme
Yetenek temini:
Plastik Boru Ekstrüzyon Hattı / Pvc Boru Ekstrüzyon Hattı Ayda 10 takım
Vurgulamak:

OD40mm Small Pvc Pipe Making Machine

,

Small Pvc Pipe Making Machine 500kg/H

,

Tube Extrusion Line 500kg/H

Ürün Açıklaması

Plastic Pipe Extrusion Line / Pvc Pipe Extrusion Line 20mm - 63mm

 

Plastic Pipe Extrusion Line / Pvc Pipe Extrusion Line Production line consists

  • Conic twin screw extruder HYZS65/132 with loader
  • Die head
  • Vacuum tank
  • Printer
  • Haul off unit
  • Cutter
  • Stacker

 

Plastic Pipe Extrusion Line / Pvc Pipe Extrusion Line HYPET advantages of 20-63mm PVC double pipe extrusion line

  • Extruder ---with Hymax gear box and high output in good quaolity
  • Die head ---pipe in three pressure, strong and bright
  • Electrical cabinet ---PLC controller auto type in good soft ware .
  • Energy saving --- 10-20% energy saving
  • Cutter--- Dustless type in new technology

 

Plastic Pipe Extrusion Line / Pvc Pipe Extrusion Line Condition of use

1. Plastic Pipe Extrusion Line / Pvc Pipe Extrusion Line Technical features of whole line

SN Specification Description Remark
1 Suitable material PVC powder  
2 Pipe diameter range Four pipe Ø20-Ø63mm. (1/2”-1 1/4’)  
3 Production speed 1.2~12 m/min  
4 Max. output 500kg/h  
5 Test and accept Based on HYPET standard formula.  
6 Center height 1,000mm  
7 Whole line size (L x W x H) 18,000 x 1,200 x 2,200mm  
8 Operation direction From right to left  
9 Color of equipment HYPET white color  
10 Control of whole production Refer to the “configuration list”.  
Note Extrusion capacity will be changed according the processing material and working conditions

 

2. Plastic Pipe Extrusion Line / Pvc Pipe Extrusion Line Circumstances condition

SN Condition Specification Description
1

Natural

circumstance

condition

Working place Indoor use
Power source No dangerous area
Humidity 55%~85% no condensation
Temperature 0~40 ℃
2

Electricity

source

Installation capacity 150 kW
Actual power consumption 50 kW
Power supply 3P+N+PE
Voltage/Frequency 380V/50Hz other can be option
3 Cooling water Temperature ≤15 ℃
Water pressure ≥0.3MPa
Flow ~15 m3/h
4 Air condition Compressor air pressure ≥0.6MPa
Flow ~0.9 m3/min

 

Plastic Pipe Extrusion Line / Pvc Pipe Extrusion Line

Plastic Pipe Extrusion Line / Pvc Pipe Extrusion Line 0

 

Plastic Pipe Extrusion Line / Pvc Pipe Extrusion Line Terms & conditions

 

1. Plastic Pipe Extrusion Line / Pvc Pipe Extrusion Line Time of delivery

 When the contract becomes valid, the machine should be delivered within 50 days since receipt of the advance payment. And the equipment will be in normal operation after debugging within two weeks after arrival.

 

2. Plastic Pipe Extrusion Line / Pvc Pipe Extrusion Line Debugging charge

The buyer pays for the plane ticket of round-trip abroad and food and accommodation of buyer’s country during debugging. And the wage of technicians should be paid by the customer (100USD/day).

 

3. Plastic Pipe Extrusion Line / Pvc Pipe Extrusion Line Guarantee clause

1) Guarantee is 1 year (excluding human factor and wearing parts).

2) Under proper working conditions, 12 months from the date of completion of commissioning at the buyer's site, and should be at the latest within 14 months from the issuing date of Bill of Lading.